Thanks for the comment - I do recall being able to do the 2nd/top pitch with a 60 meter line. But it is long (hence my estimate of ~190 feet). So I'm not sure if 70 meter rope is essential.
Totally agree. I know I wrapped one of the blocks at the top with a hitch and the spare of the rope and it was nice to have the extra rope instead of sling central.