Tioga Road Opening Date

Regional discussion and conditions reports for the Golden State. Please post partners requests and trip plans in the California Climbing Partners forum.
 

Re: Tioga Road Opening Date

Postby fedak » Sat May 27, 2017 3:49 am

My guess is Friday 6/23, though the fact that they are stalled at Olmstead point due to avvy danger is decreasing my optimism about that date.
____________________________________________________________________________________________________________________________
http://www.fedak.net/backcountry.html
User Avatar
fedak

 
Posts: 689
Joined: Tue Jun 24, 2003 5:28 pm
Location: Stateline, Nevada, United States
Thanked: 97 times in 80 posts

Re: Tioga Road Opening Date

Postby bearbnz » Mon Jun 05, 2017 9:53 pm

fedak, as of last week, the NPS crews were past Olmsted maybe a half mile, but were not yet to Tenaya Lake. From the east, Cal Trans is almost to the Park entrance. Posted some aerial photos on http://www.supertopo.com/climbing/thread.php?topic_id=2973253&tn=80
User Avatar
bearbnz

 
Posts: 348
Joined: Sun Aug 04, 2002 5:37 pm
Location: Bridgeport, California, United States
Thanked: 12 times in 5 posts

Re: Tioga Road Opening Date

Postby fedak » Tue Jun 06, 2017 6:21 am

Yup, watching the progress. They're past Tenaya now- near Lamb Dome.
____________________________________________________________________________________________________________________________
http://www.fedak.net/backcountry.html
User Avatar
fedak

 
Posts: 689
Joined: Tue Jun 24, 2003 5:28 pm
Location: Stateline, Nevada, United States
Thanked: 97 times in 80 posts

Re: Tioga Road Opening Date

Postby fedak » Wed Jun 07, 2017 5:21 pm

Park and CalTrans crews met at Tioga Pass yesterday

https://www.nps.gov/yose/planyourvisit/tioga.htm
____________________________________________________________________________________________________________________________
http://www.fedak.net/backcountry.html
User Avatar
fedak

 
Posts: 689
Joined: Tue Jun 24, 2003 5:28 pm
Location: Stateline, Nevada, United States
Thanked: 97 times in 80 posts

Re: Tioga Road Opening Date

Postby Deb » Thu Jun 08, 2017 7:45 pm

fedak wrote:Park and CalTrans crews met at Tioga Pass yesterday

https://www.nps.gov/yose/planyourvisit/tioga.htm

Do you know if it's possible to drive to Saddlebag Lake road yet?
User Avatar
Deb

 
Posts: 3143
Joined: Sun Sep 29, 2002 1:57 pm
Location: Bishop, California, United States
Thanked: 213 times in 131 posts

Re: Tioga Road Opening Date

Postby DukeJH » Thu Jun 08, 2017 8:10 pm

Yosemite national Park posted the following on Facebook 6/6:

Not long after this picture was taken, park road crews plowed their way to Tioga Pass! While this is exciting, we still have a lot of work to do to make the road safe for travel. There are still three active avalanche zones. We still have to plow parking lots, side roads, and portions of the road that are only plowed one lane wide. There is also a lot of debris to remove from the roadway and from ditches and culverts. Please be patient as our crews safely work to make the road safe for you. We'll open the road as soon as we can, but it's still going to be a little while (we don't have an estimate yet).

The picture shows the top of the entry station peeking through the snow.
User Avatar
DukeJH

 
Posts: 685
Joined: Fri Nov 01, 2002 11:12 am
Location: Garden Grove, California, United States
Thanked: 50 times in 41 posts

Re: Tioga Road Opening Date

Postby fedak » Sat Jun 17, 2017 2:02 am

Eastside to the gate opening at 2pm on Monday
____________________________________________________________________________________________________________________________
http://www.fedak.net/backcountry.html
User Avatar
fedak

 
Posts: 689
Joined: Tue Jun 24, 2003 5:28 pm
Location: Stateline, Nevada, United States
Thanked: 97 times in 80 posts

The following user would like to thank fedak for this post
Bob Sihler

Re: Tioga Road Opening Date

Postby The Defiant One » Wed Jun 28, 2017 12:17 am

fedak wrote:Eastside to the gate opening at 2pm on Monday



"Tioga Road (continuation of Highway 120 through the park) will open on Thursday, June 29, at 8 am!"

via https://www.instagram.com/p/BV3HC_2gS8y/
User Avatar
The Defiant One

 
Posts: 348
Joined: Wed Feb 23, 2005 1:34 am
Location: SF, California, United States
Thanked: 3 times in 2 posts

The following user would like to thank The Defiant One for this post
AceSierra, Marmaduke

Previous

Return to California

 


  • Related topics
    Replies
    Views
    Last post

Who is online

Users browsing this forum: No registered users and 0 guests

© 2006-2015 SummitPost.org. All Rights Reserved.