Canary Additions and Corrections

Viewing: 1-3 of 3
baloodh2000

baloodh2000 - Jun 5, 2008 1:51 pm - Voted 10/10

70m rope

On essential gear it might be worth taking a 70' rope for the second pitch.

rpc

rpc - Jun 5, 2008 2:30 pm - Hasn't voted

Re: 70m rope

Thanks for the comment - I do recall being able to do the 2nd/top pitch with a 60 meter line. But it is long (hence my estimate of ~190 feet). So I'm not sure if 70 meter rope is essential.

baloodh2000

baloodh2000 - Jun 8, 2008 11:25 pm - Voted 10/10

Re: 70m rope

Totally agree. I know I wrapped one of the blocks at the top with a hitch and the spare of the rope and it was nice to have the extra rope instead of sling central.

Viewing: 1-3 of 3
Return to 'Canary' main page