Thanks for the comment - I do recall being able to do the 2nd/top pitch with a 60 meter line. But it is long (hence my estimate of ~190 feet). So I'm not sure if 70 meter rope is essential.
Totally agree. I know I wrapped one of the blocks at the top with a hitch and the spare of the rope and it was nice to have the extra rope instead of sling central.
baloodh2000 - Jun 5, 2008 1:51 pm - Voted 10/10
70m ropeOn essential gear it might be worth taking a 70' rope for the second pitch.
rpc - Jun 5, 2008 2:30 pm - Hasn't voted
Re: 70m ropeThanks for the comment - I do recall being able to do the 2nd/top pitch with a 60 meter line. But it is long (hence my estimate of ~190 feet). So I'm not sure if 70 meter rope is essential.
baloodh2000 - Jun 8, 2008 11:25 pm - Voted 10/10
Re: 70m ropeTotally agree. I know I wrapped one of the blocks at the top with a hitch and the spare of the rope and it was nice to have the extra rope instead of sling central.