Fourth Pitch Belay

Fourth Pitch Belay

Andy Belaying me at the fourth pitch anchors (our third). We linked up the fourth and fifth pitches with a 70 meter rope. At this point I am a little bit into the second of the two pitches. 8-1-2007
agreenstreet
on Aug 3, 2007 7:24 pm
Image ID: 319813

Comments

No comments posted yet.